top of page
Sumba_Diagram.png
250553_106094989484464_3326518_n.jpg

STORE ROOM

Sumba.png

SMOKE

Local woven bamboo mat was used to direct smoke to the vents

DRAINAGE

Compound lacked drainage system.

Soiled water from bathroom and kitchen

flooded the surrounding plains

1059900_10151536640649150_127506814_n.jp
11538957_10207041991589060_3969442309764

Boy's Bathroom - 2013

Concrete structure and rock infill

The existing sanitary facilities at Yayasan Bethel were narrow and dark. There were also no proper drainage system in place. which resulted in accumulation of water and dirt. The new bathroom and toilet addresses basic needs of increase units, good lighting and privacy.

The Bathroom consist of a concrete structure with a limestone infill. The limestone rock infills provides breath ability and helps keep the toilet cool in the day

DESIGN & BUILD

Yayasan Bethel Wainapu, Sumba Island, Indonesia

2011 Kitchen

2013 Bathroom

2014 Planning for Continuity

NUS Summer Studio 2011, 2013

led by Advisor/Tutor Kazuhiro Nakajima

kitchen2.jpg

Kitchen/ Back of House - 2011

This Project involves an alternation of existing kitchen building. The lack of openings resulted bad ventilation and lighting. We decided to build on th existing structure and create a large roof overhead to create a gathering place for the caretakers of the orphanage while they cook and clean.

Scan-1.jpg
Drawings 1.jpg
1060243_10151587960564150_2125749442_n c
1063621_10151536577009150_334587415_n.jp

Crushed limestone infill

bottom of page